industrial 50 bhp electric heating steam boiler

  • Offshore price : $20000-$100000 Get a quote on the right form
  • Minimum order quantity : 1 set :industrial 50 bhp electric heating steam boiler
  • Supply Capacity : 10 units/month :industrial 50 bhp electric heating steam boiler
  • Manufacturer/Brand : Fangkuai boiler
  • Port : Anyang
  • payment terms : Letter of Credit, Wire Transfer, VISA

Leave Your Message And Get Price!

I need the quotation of , the fuel is , this capacity is , use for . My Name is , my Email is , my WhatsApp is , Please Send the detail information for me!

Popular products

HOT

θrion Gas Fired Steam Boiler

Capacity:1-20t/h

Rated thermal efficiency: 100-104%

Fixed working pressure: ≤1.6MPa

Applicable fuel:natural gas etc.

consult
HOT

Gas(oil) Fired Integrated Hot Water Boiler

Capacity:0.7-14MW

Rated thermal efficiency:96-98%

Fixed working pressure:≤1.25MPa

Applicable fuel:Natural gas, light oil, etc.

consult
HOT

H6 Gas Fired Hot Water Boiler

Capacity:0.7-2.8Mw

Rated thermal efficiency: 97.2-106%

Fixed working pressure:0.1MPa

Applicable fuel:Natural gas, etc.

consult
HOT

T7 Vacuum Hot Water Boilerr

Capacity:2.8-7.0Mw

Rated thermal efficiency:≥105.5%

Fixed working pressure:-0.02MPa

Applicable fuel:Natural gas, etc.

consult
HOT

V6 Gas Fired Hot Water Boiler

Capacity:99Kw

Rated thermal efficiency:97.2-104.4%

Fixed working pressure:1.0MPa

Applicable fuel:Natural gas, etc.

consult
HOT

Electric Steam Boiler

Capacity:0.5-4.0 t/h

Rated thermal efficiency:98%

Fixed working pressure:≤1.25MPa

Applicable fuel:electric energy

consult

Leave us a message

We will send out plans and quotations within five minutes

Name (optional)

Email

Whatsapp

Choose product type

Message

Get display discount

Contact us

Global Sales Hotline:
0086-371-60922096

Email: [email protected]

Voicemail
  • Compre Special Project (PPE &IPE) | PDF | Boiler | Thermal

    ME Board Problem Local coal with higher heating value of 5,500 kCal/kg is burned in a pulverized coal fired boiler with 25% excess air at the rate of 25.9 M.T. per hour when the steam generated is 220 M.T. per hour. This boiler is served by 2 forced-draft fans of equal capacityGet Price

  • MCQ in Power Plant Engineering Part 8 | ME Board Exam

    Dec 19, 2020 · 379. A water tube boiler has a capacity of 1000 kg/hr of steam. The factor of evaporation is 1.3, boiler rating is 200%, boiler efficiency is 65% and heating surface area is 0.91 m 2 per bo.Hp. and the heating value of fuel is 18,400 kCal/kg. The total coal available in the bunker is 50,000 kg.Get Price

  • Board Exam1 | PDF | Enthalpy | Pressure - Scribd

    A steam generating plant consisting of a boiler, an economizer and super heater generates superheated steam at the rate of 50 tons per hr. feedwater enters the boiler at 5 MPa and 120 °C. Steam leaves the superheater at 4.5 MPa and 320 °C. if the coal used has a heating value of 30,000 kJ/kg, calculate the no. of tons of coal fired per hr for Get Price

  • Compre Special Project (PPE &IPE) | PDF | Boiler | Thermal

    ME Board Problem Local coal with higher heating value of 5,500 kCal/kg is burned in a pulverized coal fired boiler with 25% excess air at the rate of 25.9 M.T. per hour when the steam generated is 220 M.T. per hour. This boiler is served by 2 forced-draft fans of equal capacityGet Price

  • Steam Capacity Conversion Table | Industrial Controls

    Dec 13, 2010 · 250 BHP Boiler. 250(BHP) x 0.069 (gpm/BHP) x 10 (min) x 1.33(SF) = 229.425 . Because of the 10 minute multiplier used in calculating a boiler feed pump receiver for boilers 200 BHP and over, a very fast sizing estimate can be done by simply stating that 1 BHP = 1 gallon of gross receiver capacity. In other words, the 400 BHP boiler needs about Get Price

  • Compre Special Project (ppe &ipe) [vnd5gjm03rlx]

    ME Board Problem Local coal with higher heating value of 5,500 kCal/kg is burned in a pulverized coal fired boiler with 25% excess air at the rate of 25.9 M.T. per hour when the steam generated is 220 M.T. per hour. This boiler is served by 2 forced-draft fans of equal capacity delivering the air at 305 mm of water to the furnace.Get Price

  • Board Exam1 | PDF | Enthalpy | Pressure - Scribd

    A steam generating plant consisting of a boiler, an economizer and super heater generates superheated steam at the rate of 50 tons per hr. feedwater enters the boiler at 5 MPa and 120 °C. Steam leaves the superheater at 4.5 MPa and 320 °C. if the coal used has a heating value of 30,000 kJ/kg, calculate the no. of tons of coal fired per hr for Get Price

  • Refinery Terminology | refinery4refiners

    Apr 28, 2013 · Boiler. Equipment which is similar to fired heater/furnace having tubes insides to produce steam. Boiler Feed Water. See BFW definition. Brake Horse Power. See BHP definition. Bromine Number. The amount of bromine in grams absorbed by 100 grams of a sample. The number indicates the degree of unsaturation.Get Price

  • Complete Inventory List

    Boilers and Water Heating Systems (1) Cleaver Brooks CFV 25hp Boiler with Feedwater Tank and Blow Down Separator (1) 2004 Fulton FB-075-L 75KW Electric Steam Boiler (1) 2003 Fulton VMP 40 LE 40hp Vertical Steam Boiler (1) Fulton FT-0160-C Vertical Coil Design Thermal Fluid Heater (1) Hamilton HLD 01050 Hot Water HeaterGet Price

  • Refinery Terminology | refinery4refiners

    Apr 28, 2013 · Boiler. Equipment which is similar to fired heater/furnace having tubes insides to produce steam. Boiler Feed Water. See BFW definition. Brake Horse Power. See BHP definition. Bromine Number. The amount of bromine in grams absorbed by 100 grams of a sample. The number indicates the degree of unsaturation.Get Price

  • PIPE ALBORBOR RAINBOW BOOK (CP) | PDF | Heat | Heat Transfer

    A Two boilers are operating steadily on 91,000 kg of coal contained in a bunker. One boiler is producing 1591 kg of steam per hour at 1.2 factor of evaporation and an efficiency of 65% and another boiler produced 1364 kg of steam per hour and 1.15 factor of evaporation and an efficiency of 60%.Get Price

  • Complete Inventory List

    Boilers and Water Heating Systems (1) Cleaver Brooks CFV 25hp Boiler with Feedwater Tank and Blow Down Separator (1) 2004 Fulton FB-075-L 75KW Electric Steam Boiler (1) 2003 Fulton VMP 40 LE 40hp Vertical Steam Boiler (1) Fulton FT-0160-C Vertical Coil Design Thermal Fluid Heater (1) Hamilton HLD 01050 Hot Water HeaterGet Price

  • City-Wide Fee Schedule - Houston

    HVAC - Ventilating Systems or Heating-only Systems (other than boilers) Base Charge plus 2% of Unit Valuation: Bldg. Code Sec. 118.3.1(1); Ord. No. 2010-1016: Calculation: 1/1/2016: Building Code - HVAC Equipment: HVAC - Repairs or Alterations to an existing heating, ventilating, A/C or refrigeration system Base ChargeGet Price

  • Basic Power and Industrial Plant Engineering - VSIP.INFO

    SOLUTION: Boiler - 17 23.5 kg of steam per second at 5 Mpa and 400°C is produced by a steam generator. The feedwater enters the economizer at 145°C and leaves at 205°C. The steam leaves the boiler drum with a quality of 98%. The unit consumes 2.75 kg of coal per second as received having a heating value of 25,102 KJ/kg.Get Price

  • Basic Power and Industrial Plant Engineering - VSIP.INFO

    SOLUTION: Boiler - 17 23.5 kg of steam per second at 5 Mpa and 400°C is produced by a steam generator. The feedwater enters the economizer at 145°C and leaves at 205°C. The steam leaves the boiler drum with a quality of 98%. The unit consumes 2.75 kg of coal per second as received having a heating value of 25,102 KJ/kg.Get Price

  • Tiếng anh chuyên ngành cơ điện (M&E) | Tiếng Anh Kỹ Thuật

    Dec 29, 2013 · 50 Diffential amplifier Bộ/mạch khuếch đại vi sai. BFP Boiler Feed-water Pump. BHP Brake Horse Power. BIL Basic Impulse Level. BKR Breaker. B/L Bill of Lading. BM(BOM) Bill of Material HRSG Heat Recovery Steam Generator. HVAC Heating, Ventilation & Air Conditioning. I/C Inspection Certiviate. ICT Interposing CT.Get Price

  • Steam Capacity Conversion Table | Industrial Controls

    Dec 13, 2010 · 250 BHP Boiler. 250(BHP) x 0.069 (gpm/BHP) x 10 (min) x 1.33(SF) = 229.425 . Because of the 10 minute multiplier used in calculating a boiler feed pump receiver for boilers 200 BHP and over, a very fast sizing estimate can be done by simply stating that 1 BHP = 1 gallon of gross receiver capacity. In other words, the 400 BHP boiler needs about Get Price

  • MCQ in Power Plant Engineering Part 8 | ME Board Exam

    Dec 19, 2020 · 379. A water tube boiler has a capacity of 1000 kg/hr of steam. The factor of evaporation is 1.3, boiler rating is 200%, boiler efficiency is 65% and heating surface area is 0.91 m 2 per bo.Hp. and the heating value of fuel is 18,400 kCal/kg. The total coal available in the bunker is 50,000 kg.Get Price