combined 12 ton condensing gas boiler
Capacity:1-20t/h
Rated thermal efficiency: 100-104%
Fixed working pressure: ≤1.6MPa
Applicable fuel:natural gas etc.
Capacity:0.7-14MW
Rated thermal efficiency:96-98%
Fixed working pressure:≤1.25MPa
Applicable fuel:Natural gas, light oil, etc.
Capacity:0.7-2.8Mw
Rated thermal efficiency: 97.2-106%
Fixed working pressure:0.1MPa
Applicable fuel:Natural gas, etc.
Capacity:2.8-7.0Mw
Rated thermal efficiency:≥105.5%
Fixed working pressure:-0.02MPa
Applicable fuel:Natural gas, etc.
Capacity:99Kw
Rated thermal efficiency:97.2-104.4%
Fixed working pressure:1.0MPa
Applicable fuel:Natural gas, etc.
Capacity:0.5-4.0 t/h
Rated thermal efficiency:98%
Fixed working pressure:≤1.25MPa
Applicable fuel:electric energy
Nov 19, 2021 · It requires more wall space as it incorporates two separate units, one water boiler, and the other an in-line water heater. The cost is comparable to Navien NCB 240e costs, depending upon the area to be heated. Stiebel offers the Hydro Shark® in both natural gas and electric-powered configurations.Get Price
BW5 B Oil Boiler with Tankless Coil BW9 A Gas-Fired Direct Vent Condensing Water Boiler 576 H Commercial—Air Cooled Condensing Unit 579 F Commercial—Gas Heat/Electric Cool 018 1.5 ton 024 2 ton 030 2.5 ton Etc. MODEL CODE SIZE 001 First Size 002 Second SizeGet Price
Jun 07, 2018 · If you take the heating bill part of this (approx. £950) with an 80% efficient gas boiler and a unit of gas is 4p / kWh – it would suggest using 23650kWh of gas. If you used an electric heating system operating at efficiency it would require 18920 kWh of electricity – which indeed is less in pure numbers terms, but at 11p/kWh it would Get Price
Dec 29, 2021 · Soneyinrd you need both. Buy a boiler that has been around awhile. Condensing boilers are new, but efficient. Buy your primary pump, and your sector pumps. Know the difference between primary, and secondary piping. You will need an expansion tank. I used a mixture of copper, and pex. And a thermostat. (In the Bay Area, we use natural gas.Get Price
BW5 B Oil Boiler with Tankless Coil BW9 A Gas-Fired Direct Vent Condensing Water Boiler 576 H Commercial—Air Cooled Condensing Unit 579 F Commercial—Gas Heat/Electric Cool 018 1.5 ton 024 2 ton 030 2.5 ton Etc. MODEL CODE SIZE 001 First Size 002 Second SizeGet Price
A hot water boiler designed to operate at or below a water pressure of 160 psig and a temperature of 250 °F; or A boiler that is designed to be capable of supplying either steam or hot water, and designed to operate under the conditions in Sections 2.1.1 and 2.1.2 of this scope.Get Price
Nov 19, 2021 · It requires more wall space as it incorporates two separate units, one water boiler, and the other an in-line water heater. The cost is comparable to Navien NCB 240e costs, depending upon the area to be heated. Stiebel offers the Hydro Shark® in both natural gas and electric-powered configurations.Get Price
Jun 21, 2012 · Boiler Presentation 1. By- Mukesh Jha Sr.Engineer -Projects, a2z Powercom Pvt.Ltd. 2. Boiler- As per "THE INDIAN BOILERS(AMENDMENT ) ACT2007 A 'Boiler' means a pressure vessel in which steam is generated for use external to itself by application of heat which is wholly or partly under pressure when steam is shut off but does not include a pressure …Get Price
Jun 07, 2018 · If you take the heating bill part of this (approx. £950) with an 80% efficient gas boiler and a unit of gas is 4p / kWh – it would suggest using 23650kWh of gas. If you used an electric heating system operating at efficiency it would require 18920 kWh of electricity – which indeed is less in pure numbers terms, but at 11p/kWh it would Get Price
48 Bab 3 – Boiler Pengukuran gas cerobong suatu oil fired boiler (hasil perhitungan neraca massa dan energi disajikan pada Gambar 3.9) menunjukkan: a. temperatur 225oC b. kadar O2 di gas cerobong = 7,8% Dengan mengikuti garis putus-putus mendatar dan kemudian ke atas: c. kadar CO2 di gas cerobong = 9,8% Setelah garis tersebut mencapai Get Price
Jun 21, 2012 · Boiler Presentation 1. By- Mukesh Jha Sr.Engineer -Projects, a2z Powercom Pvt.Ltd. 2. Boiler- As per "THE INDIAN BOILERS(AMENDMENT ) ACT2007 A 'Boiler' means a pressure vessel in which steam is generated for use external to itself by application of heat which is wholly or partly under pressure when steam is shut off but does not include a pressure …Get Price
Feb 21, 2016 · The lower efficiency in more conventional power stations is attributed to wasted heat in the exhaust steam in the condenser. One example of a gas-turbine process is outlined in the following figure. Figure 3.1 is a gas-turbine cogeneration process with a heat recovery steam generator (waste-heat) boiler.Get Price
Boilers: $1,200 to $9,000 for a condensing boiler or high-efficiency seasonal/non-seasonal boiler; Furnaces: $400 for a condensing furnace; Water heaters: $900 to $1,250 for condensing storage or tankless water heaters; Low-flow showerheads: free in eligible units, or $12.50 per low-flow showerhead; New in-suite HRVs and ERVs: up to $250 per unitGet Price
Boilers: $1,200 to $9,000 for a condensing boiler or high-efficiency seasonal/non-seasonal boiler; Furnaces: $400 for a condensing furnace; Water heaters: $900 to $1,250 for condensing storage or tankless water heaters; Low-flow showerheads: free in eligible units, or $12.50 per low-flow showerhead; New in-suite HRVs and ERVs: up to $250 per unitGet Price
Feb 21, 2016 · The lower efficiency in more conventional power stations is attributed to wasted heat in the exhaust steam in the condenser. One example of a gas-turbine process is outlined in the following figure. Figure 3.1 is a gas-turbine cogeneration process with a heat recovery steam generator (waste-heat) boiler.Get Price
The evaporator (boiler) is a high-efficiency heat exchanger to absorb heat from the exhaust gas or EGR gas and transfer the exhaust energy to the working fluid. The expander may be able to handle two-phase flows and produces mechanical or electrical power. The expander can be an axial turbine, a piston expander, a screw or scroll expander.Get Price